Sports complex Fizmat

Sports complex Fizmat

A modern gym should have not only a variety of high-quality equipment, but also a stylish interior. On the wave of popularity of such a social network as Instagram, do not underestimate the impact of training photos on the popularity of the institution. A striking example of an ideal location for sports and spectacular photos is the sporthub Fizmat, in the construction and arrangement of which CCG Development specialists took an active part.

The gym we deserve

Fizmat is a 700 square meter state-of-the-art gym of a new type. It is functional and very “Instagram” in every detail. Our team for 60 days performed:
● Repair and construction works.
● Installation of engineering networks.
● Manufacture and installation of furniture, decorative elements.

In addition to the main works, there was also a need for partial reconstruction of the premises.

The hall has several non-standard design solutions for the hall, namely:
● Marble as a finishing material in the reception area.
● “Living” wall of plants.

Location

Kyiv, Gogolivska st., 22-24

Time spent

60 days

Area

700 sq.m

Number of employees

20

Year

2020

Scope of work

repair and construction works, installation of engineering networks, manufacture and installation of furniture and decorative elements

Concept
Project content
Process

CCG Development professionals have turned the facility into a unique sports hub that has no analogues. We used:
● Acoustic panels.
● Custom-made luminaires.
● Special sports linoleum.
● Author’s geometric ornaments on the wall instead of photo wallpaper.
● 3D sign in the reception area.

The result of the works exceeded expectations. The spacious, light-filled gym is made in loft and minimalist styles, it attracts attention with branded blue and orange colors, geometric images, a motivating LED sign “Train smart”.

What does CCG Development have in common with Fizmat?

We, like our colleagues from Fizmat, know that for every race, regardless of whether it is a business or a sport, the main thing is active communication between all participants in the process. That is why, in this project we have provided active communication between all participants: project manager, client, specialists on the construction site, masters of our own furniture shop Horeca Furniture. Also, we reported weekly in digital format to the customer on the status of the object, the state of the budget, existing or probable problems and ways to solve them.

Before
Before
After
After

Contacts

Ukraine, Kyiv city, Mechnykova St, 3
+38 066 599 18 17 / +38 095 341 66 56
info@ccg.kiev.ua

    Submit your application